ADCON Products beginning from scratch (raw material stage) to final quality product stage pass through standard process and inspection plan. All routine tests as per relevant standard method.

Raw Material Testing: As per standard methods.
In-process Testing:
  1. Coil stage
  2. After dressing
  3. After assembly

Final Testing: As per BIS and international standards.

Random Testing: As per sampling method.
All Routine Tests: For Current Transformer as per BIS: 2705/1992.
  1. Terminal marking & polarity test.
  2. High voltage test on primary winding.
  3. High voltage test on secondary winding.
  4. Accuracy test.
  5. Over voltage intern turn test.
All Routine Tests: For Potential Transformer as per BIS: 3156/1992.
  1. Terminal marking & polarity test.
  2. High voltage test on primary winding.
  3. High voltage test on secondary winding.
  4. Accuracy test.
All Routine Tests: For Control Transformer as per BIS: 12021/1987.
  1. Verification of terminal markings.
  2. Measurement of winding resistances.
  3. Dielectric test.
  4. Measurement of insulation resistance.
  5. Measurement of no load current.
  6. Measurement of no load voltage
  7. Measurement of full load voltage.
  8. Voltage regulation.